WANGA’s Backup Power System Ensures Operational Continuity for Prince of Songkla University in Thailand

Oct 13, 2025

Leave a message

Project Background and Requirements​

Prince of Songkla University (PSU), a leading comprehensive university in Southern Thailand with five campuses and approximately 35,000 students, requires a robust backup power solution to support its expanding teaching facilities and critical infrastructure. The university's key facilities-including laboratories, data centers, and medical units-demand uninterrupted power, with a specific requirement for the generator set to achieve ​100% single-step load acceptance within 10 seconds​ during grid outages.

 

WANGA deployed a ​DL288W-50 silent canopy diesel generator set​ after conducting an on-site assessment. Equipped with a high-pressure common rail fuel injection system and a 6-cylinder WANGA engine, the unit demonstrated the capability to ​achieve 0 to 100% load acceptance in just 6 seconds, exceeding the university's performance requirement. The generator also incorporates a silent canopy design, reducing operational noise to below 75dB at 7 meters, aligning with campus environmental standards.

​Technical Solution and Power Compatibility Optimization​

​Power Validation and Adjustment Suggestions

​

  • ​Current Configuration Analysis: The DL288W-50 unit's exact rated power is to be confirmed by PSU (estimated at 300-400kW based on the model). However, considering the university's potential peak load from laboratories, HVAC systems, and IT infrastructure, demand could reach 500-800kW.
  • ​Optimization Recommendation: If future expansions include high-energy facilities (e.g., medical research centers), upgrading to a 600kW unit (Model DL660W-50S) with 20% power redundancy is advised to cover inrush currents from motor-driven equipment (e.g., laboratory devices with starting currents up to 6 times the running current).

 

​Scenario-Specific Functional Design

​

  • ​Rapid Response Mechanism: High-precision fuel injection ensures full load acceptance within 6 seconds, supporting seamless transitions for UPS-backed data centers and medical equipment.

 

  • ​Silent and Eco-Friendly Operation: Multi-layer sound insulation keeps noise below campus daytime limits (55dB); emissions comply with Thailand Tier 3 standards (NOx <4g/kWh).

 

  • ​Intelligent Monitoring System: Integrated remote control enables real-time parameter tracking via mobile devices, allowing automated operation without on-site staff.

​Benchmarking Against Industry Standards for University Backup Power​

​Power Type​

​Response Time​

​Typical Application​

​PSU Project Advantage​

Conventional Diesel Generator

30-60 seconds

Basic lighting and equipment

80% faster response, full-load coverage

UPS Battery Backup

≤0.5 seconds

Precision instruments, instant backup

Synergizes with existing UPS for dual protection

WANGA DL288W-50

​6 seconds​

Campus-critical loads (labs, medical)

Exceeds industry standards for single-step loading

 

Implications for Power Assurance in Thai Educational Facilities​

  • ​Standardization Reference: The ≤10s load acceptance and ≤75dB noise level can serve as a benchmark for Southeast Asian universities.

 

  • ​Sustainable Evolution: The design reserves interfaces for biodiesel and solar energy storage, supporting Thailand's 2037 renewable energy goals.

 

  • ​Policy Advancement: Thailand's Ministry of Education plans to include "single-step load ≥100%" in its 2025 Campus Infrastructure Guidelines, with this project providing a technical reference.

 

Conclusion: The WANGA DL288W-50 unit meets PSU's current needs with superior performance, offering a replicable model for power resilience in tropical academic environments. As Thailand advances its education internationalization, high-reliability backup power systems will become integral to campus critical infrastructure.

 